Product Detail :
|
Improvement of road from addition, altration road at 36 miles point to chandramani para. Improvement of road at various location. Earth works in information brick soling & one no box cell culvert of clear span 4.00m x 4.00m at ch 0.375 km and maintenance of brick soling. Construction of cc road inside the hosel complex including road side pucca drain. Repair of existing box cell culvert by rcc work in between cut off wall and base slab.
|